Skip to main content

Automation Build

Build a workflow your team can run.

I turn an approved workflow design into a working automation, with clear access rules, human review, and a plan for exceptions.

Free introductory conversation.

The facts

Fixed quote
scoped before work starts
4–6 weeks
usually, after prerequisites
1 workflow
up to three systems, one environment
14 days
defect correction after handoff

The base scope covers one approved workflow with bounded, human-reviewed output. Testing, documentation, and training are included. Usage costs and ongoing operation are separate.

Use this when

  • A workflow design is approved and you need it built in your environment.
  • The system has to read from and write to real marketing systems, such as your CRM, marketing automation, or analytics, under defined access and permissions.
  • Exceptions need a route, not a dropped record.
  • Your team needs to own the result after handoff, with documentation written for the owner.

You leave with

A working automation in your environment, access and permission rules, acceptance tests, documentation and training, an operating guide written for the owner, and 14 days of defect correction.

Don't have a complete specification yet? That's normal. The Workflow Design Sprint is where we decide whether the work should be automated, what the system may read and write, what a person still owns, how exceptions move, and what a builder must prove before launch. The person reviewing during testing and after handoff needs enough context to recognize what is wrong and enough authority to act on it. A review screen alone is not a working control.

What a build produces

Input in, reviewed output out, and a place for everything else.

A model can produce something unsupported. The build's job is to detect that, constrain it, and route it to a person.
  1. Input · as received

    High-priority and client-related email content, client deliverables, client meetings notes with action items, and outstanding tasks by client. Paired with it - key industry and tool news and updates for broader context.

    Read from up to three systems the client already licenses.

  2. Output · reviewed by a person

    A weekly email that assesses client health, opportunities & insights, and challenges and blockers. Kick off your week with actionable next steps that will help you build your business.

    Approved by the named owner. Nothing ships without this step.

  3. Exception · routed, not dropped

    When a workflow that gathers and collates any of the input or output doesn't run - an alert goes out immediately to an engineer for assessment. If the model is uncertain about key takeaways - it will admit uncertainty rather than inventing results.

    Unmatched, low-support, or failed items go to a named reviewer with the original attached.

Illustrative layout. Published examples will use approved build output or a clearly labeled synthetic reconstruction. No client drafts or identifying metadata.

Before we start

Four things that have to be true first.

A Build starts from a decision that's already been made. If any of these are missing, the Sprint is where we make them.
  1. An approved workflow design

    A specification with access rules, review points, exception route, and acceptance criteria. From a Sprint, your team, or another builder. I review existing work before reusing it.

  2. Systems with supported interfaces

    Up to three systems your team already licenses, each with a documented way in. Custom connectors are scoped separately.

  3. A named owner with time to review

    Someone who will check output during testing, sign off at acceptance, and run the workflow after handoff.

  4. One production environment, access granted

    Procurement, security review, and account provisioning happen before the clock starts. Delays here move the schedule, not the scope.

What's included

The base scope, and what moves it.

The base scope is one bounded, well-prepared workflow, built properly. I won't squeeze a larger job into it by removing review or testing.

In the floor

  • One approved workflow, up to three systems
  • Access rules, human review step, and exception routing as specified
  • Agreed test plan, run with your owner
  • Operating guide and acceptance checklist
  • Training for the people who run it
  • 14-day defect correction window after accepted handoff

Scoped separately

  • Additional use cases or workflows
  • Custom connectors for systems without a supported interface
  • Data migration or cleanup
  • Heightened assurance, audit, or compliance needs
  • Model and platform usage costs, paid by you
  • Ongoing operation, monitoring, and new features

Milestones

Four milestones. Three payments.

Usually four to six weeks once prerequisites are in place. Billing follows the milestones, so nothing is paid for before it can be checked.
  1. Milestone 1

    Kickoff

    What I do

    Confirm the specification, access, and test plan. Set up the environment.

    What you do

    Grant access. Name the owner. Supply sample inputs for testing.

    40% billed at kickoff

  2. Milestone 2

    Working build

    What I do

    Build the workflow, the review step, and the exception route. Run it on sample inputs and share results weekly.

    What you do

    Look at weekly outputs. Flag anything that reads wrong. About an hour a week.

    No payment at this milestone

  3. Milestone 3

    Staging ready

    What I do

    Staging build ready for your acceptance testing against the agreed criteria. Fix what the tests find.

    What you do

    Owner runs the acceptance checklist on real-shaped inputs. Sign off, or send back with specifics.

    40% when staging is ready for acceptance

  4. Milestone 4

    Accepted handoff

    What I do

    Move to production. Deliver the operating guide. Train the people who run it. 14-day defect window begins.

    What you do

    Attend training. Run the workflow. Report defects within 14 days.

    20% at accepted handoff

After handoff

You run it. I fix what I broke.

The operating guide is written for the owner, not for me. If they can't run it from the guide, the guide isn't finished.

Operating guide

What to check, how often, what "wrong" looks like, and who to call. Kept with the workflow, not in my inbox.

14-day defect window

Anything that doesn't meet the accepted criteria gets fixed at no charge for 14 days after handoff.

Not a defect

A new feature, a changed requirement, or a system you connected afterward. Those are a new scope, quoted separately.

Running costs

Model and platform usage is billed to your accounts. I'll estimate it from testing volume before handoff. Ongoing operation can be covered under Advisory or a separate agreement.

In their words

“When Allison builds a workflow, she will really 'dot her i's and cross her t's'. By thinking about edge cases and performing rigorous QA, she builds solutions that stand the test of time.”

Excerpts from 2025-2026 company award submissions

A laptop open on a desk, mid-edit, seen from the side.

Before you book

Common questions.

Anything not covered here, bring to the call.

Can you build from a specification we already have?

Yes. I review it first for access rules, review points, exceptions, and acceptance criteria. If those are there, we start. If not, a short Sprint fills the gaps. You won't be asked to repeat work without a reason.

Will the model ever make something up?

It can. I won't promise otherwise. The build is designed so unsupported output is detected, constrained to what the review step allows, and routed to a person. The acceptance tests check that routing works.

What happens after the 14 days?

You own and run it. If you want a standing second opinion or help with changes, Advisory covers that. New features are quoted as new scope.

Do we own the code and configuration?

Yes. Everything runs in your accounts and is documented for your owner. Nothing depends on me staying involved.

Bring the specification, or the workflow that needs one. We'll work out whether it's ready to build.

Free introductory conversation. No preparation required.